High Rise buildings of more than 6 stories and some mid-rise buildings of between 2 and 6 stories are constructed using various types of panelized framing systems. These are prefabricated panel sections–typically made of wood or engineered lumber–that are engineered and built in an off-site factory, shipped to the site and erected with help from cranes that lift the sections into place where they can be attached with bolts, welding or other methods of anchorage. These prefabricated framing panels are intended to be an improvement over traditional stick framing built by framing contractors at the site because they allow the building to be erected more safely and quickly than can be accomplished through stick framing–especially in bad weather. In addition, factory manufacturing theoretically allows better quality control and tighter tolerances. Problems with these panelized framing systems include, among other things:
These are panelized sections of complete wall assemblies that are typically one- story high including holes for windows. The panels typically have a structural supporting frame fabricated from structural steel, sheathing mounted on galvanized steel sheets, an air barrier/vapor retarder, insulation installed inside the air space, an exterior material with drainage capacity such as brick, stucco, EIFS, aluminum panels, etc , and an interior drywall normally consisting of gypsum sheathing.
This is a building enclosure system that is supported by the building frame rather than by a masonry or other load-bearing wall. Curtain wall systems are usually made of aluminum with large areas of glass. Standard commercial systems are available. There are also custom systems designed with special mullions, parts and accessories. Some of the premium systems are pressure equalized so that outside and inside pressure is the same, theoretically eliminating or at least reducing the possibility that water will be pulled inside the wall assembly during wind-driven precipitation. Non-pressurized systems also exist which use weep holes to allow water to drain out of the wall system.
Problems with Panelized and Curtain Wall Systems
A careful evaluation of the building by a qualified expert is necessary in order for you to understand the condition of the building, the causes of any deficiencies in design, materials or construction methods, and the extent of the damages resulting therefrom. Once that information is compiled, counsel can help you determine what your options are for recovering your damages and getting your building fixed.
Bruce H. Stern, Esq. Secures $5.5 Million Settlement for Traumatic Brain Injury Victim
Stark & Stark is pleased to announce that Shareholder Bruce H. Stern, Esq., Certified Civil Trial Attorney and member of the firm’s Accident...“Best Law Firms” 2027 List Issued by Best Lawyers Recognizes Stark & Stark PC
We are proud to announce that the firm has been included in the 2027 Edition of Best Lawyers “Best Law Firms®” list, earning 11 regional...Bruce H. Stern, Esq. Secures $950,000 Settlement for Traumatic Brain Injury Client
Stark & Stark is pleased to announce that Shareholder Bruce H. Stern, Esq., Certified Civil Trial Attorney and member of the firm's Accident...Evan J. Lide, Esq. Secures $2.15 Million Wrongful Death Settlement
Stark & Stark is pleased to announce that Shareholder Evan J. Lide, Esq. recently secured a $2,150,000 settlement on behalf of the family of a...Stark & Stark Attorneys Recognized as New Jersey “Super Lawyers” and “Rising Stars” in 2027
Stark & Stark is pleased to announce that 16 of its attorneys have been selected for inclusion in the list of 2027 New Jersey Super Lawyers,...Stark & Stark’s Chinsu Shajan, Esq. Receives Mercer County Bar Association Rising Leader Award
Stark & Stark is proud to announce that Chinsu Shajan, Esq., a Shareholder in the Firm’s Accident & Personal Injury Group, was honored by...